Abstract

When carrying out the construction and installation works of nuclear power facilities, one of the main stages of geodetic work at a construction site is the creation of a layout grid. The article considers the issue of designing an internal layout grid at the source and installation horizons. It is proposed to use the free stationing method when creating the internal layout grid. A model of the internal circuit in the reactor building was created and accuracy pre-calculation was performed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call