Abstract

Wide area measurement system (WAMS) is one of the essential components in the future power system. To make WAMS construction plans, practical models of the power network observability, reliability, and underlying communication infrastructures need to be considered. To address this challenging problem, in this paper we propose a unified framework for WAMS planning to cover most realistic concerns in the construction process. The framework jointly optimizes the system construction cost, measurement reliability, and volume of synchrophasor data traffic resulting in a multi-objective optimization problem, which provides multiple Pareto optimal solutions to suit different requirements by the utilities. The framework is verified on two IEEE test systems. The simulation results demonstrate the trade-off relationships among the proposed objectives. Moreover, the proposed framework can develop optimal WAMS plans for full observability with minimal cost. This work develops a comprehensive framework for most practical WAMS construction designs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.