Abstract

Scheduling can have significant impacts on energy saving in manufacturing systems. The complex process constraints and dynamic manufacturing tasks in flexible manufacturing system make the scheduling a complicated nonlinear programming problem. To this end, this paper proposes a two-stage energy-saving optimization method for Flexible Job-Shop Scheduling Problems (FJSP). In this method, an operation-based integrated chart is firstly proposed to reveal the dynamic characteristics of the operations, enabling the energy-saving scheduling optimization. Then the optimization is conducted at two stages: the machine tool stage and the operation sequence stage. A Modified Genetic Algorithm (MGA) is applied at the first stage and a hybrid method that integrates Genetic Algorithm (GA) with Particle Swarm Optimization (PSO) is adopted at the second stage. Finally, a case study is employed to illustrate the applicability and validity of the proposed method. The results revealed that the proposed method can effectively optimize FJSP. This may provide a basis for decision makers to utilize a manufacturing scheduling that is optimized regarding its energy saving.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.