Abstract
IT service outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the principal-agent theory is used to build the model for schedule risk control of IT outsourcing project. According to the feature of problem, Genetic Algorithm (GA) is designed to solve the proposed model and the optimal plan of controlling schedule risk is given based on the simulation analysis. The simulation results demonstrate that this paper can provide the scientific quantitative proposal for the decision maker who needs to control the schedule risk of IT outsourcing project.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.