Abstract
The integrated community energy system (ICES) has aroused considerable attention for its low emission and high operating efficiency. The existing configuration methods for ICES with multi-energy sectors ignored the controllable load. In this paper, a two-stage configuration method of ICES is developed to achieve the minimum annual investing and operating cost. At the first stage, the capacities of components in ICES are optimized to minimize the annual investment cost of ICES. At the second stage, the annual operating cost including the electricity and gas purchase costs and the component maintenance cost is minimized to satisfy the energy load. The controllable load under the time-of-use energy price in seasonal typical days is considered in the second stage. Relevant simulations are conducted to validate the effectiveness of the proposed configuration method for ICES. Considering the controllable load, comparative simulations illustrate that the proposed configuration method can significantly reduce the battery investment cost.
Highlights
Summary
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.