Abstract

This paper addresses the problem of scheduling cascaded ‘blocked out’ continuous processing units separated by finite capacity storage tanks. The raw materials for the product lines arrive simultaneously on the input side of the first unit. But every unit can process only one product line at a time, thus giving rise to the possibility of spillage of raw material due to limited storage capacity. The need to process multiple product lines and the added constraint of multiple intermediate upliftment dates aggravate the problem. This problem is quite common in petrochemical industry. The paper provides a MINLP (Mixed Integer Non-Linear Programming) formulation of the problem. However, for any realistic scheduling horizon, the size of the problem is too large to be solved by standard packages. We have proposed a depth first branch and bound algorithm, guided by heuristics, to help planners in tackling the problem. The suggested algorithm could output near optimal solutions for scheduling horizons of 30 time periods when applied to real life situations involving 3 units and 3 product lines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.