Abstract

This paper addresses a two-agent scheduling problem where the objective is to minimize the total late work of the first agent, with the restriction that the maximum lateness of the second agent cannot exceed a given value. Two pseudo-polynomial dynamic programming algorithms are presented to find the optimal solutions for small-scale problem instances. For medium- to large-scale problem instances, a branch-and-bound algorithm incorporating the implementation of a lower bounding procedure, some dominance rules and a Tabu Search-based solution initialization, is developed to yield the optimal solution. Computational experiments are designed to examine the efficiency of the proposed algorithms and the impacts of all the relative parameters.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.