Abstract

A single machine scheduling problem with assignable job due dates to minimize total late work has recently been introduced by Mosheiov, Oron, and Shabtay (2021). The problem was proved NP-hard in the ordinary sense, and no solution algorithm was proposed. In this note, we present two pseudo-polynomial dynamic programming algorithms and an FPTAS for this problem. Besides, we introduce a new single machine scheduling problem to minimize maximum late work of jobs with assignable due dates. We develop an O(nlogn) time algorithm for it, where n is the number of jobs. An optimal solution value of this new problem is a lower bound for the optimal value of the total late work minimization problem, and it is used in the FPTAS.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call