Abstract

A single machine scheduling problem with assignable job due dates to minimize total late work has recently been introduced by Mosheiov, Oron, and Shabtay (2021). The problem was proved NP-hard in the ordinary sense, and no solution algorithm was proposed. In this note, we present two pseudo-polynomial dynamic programming algorithms and an FPTAS for this problem. Besides, we introduce a new single machine scheduling problem to minimize maximum late work of jobs with assignable due dates. We develop an O(nlogn) time algorithm for it, where n is the number of jobs. An optimal solution value of this new problem is a lower bound for the optimal value of the total late work minimization problem, and it is used in the FPTAS.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.