Abstract

The Build–Operate–Transfer (BOT) scheme is widely applied in many cities, wherein firms compete to invest in road building and aim to maximize their profits by collecting tolls from users traveling on the roads under their control. Previous research analyzing the private road competition problem assumed that all the new roads would be constructed and operated by private firms under the BOT scheme. The present study recommends a more proactive participation from the government in the new road construction and operation so as to ensure the fulfillment of social welfare. We characterize this problem into a tri-level optimization model. In such a multi-competition game, strategic interaction and market equilibrium must be taken into consideration to determine their investment (road capacity) and price (toll level). Game-theoretic approaches are applied when the toll road network is controlled by more than one private company. Then, we propose a heuristic approach to solve the model and its validity is justified by a simple network numerical example.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.