Abstract

We describe a scheduling system for the curing operation at Bridgestone/Firestone Off-The-Road (BFOR), a manufacturer of large tires for heavy off-the-road machines such as trucks, tractors, and earthmoving equipment used in the construction, lumber, and mining industries. The huge tires, having different priorities, are built in molds and put into heaters for the curing process. The problem is to find a feasible assignment of tires to molds and molds to heaters to achieve a maximum total priority. Our system produces about 7% more tires per shift compared to the previous manual way of developing schedules and moves the company toward its goal of quick response manufacturing with low inventories. The core algorithm is a column generation procedure to produce a production schedule for one work shift. This approach is then used in a “rolling horizon” fashion. The size of the problem posed several computational challenges. Computational efficiencies come from (1) a dramatic effort to eliminate alternative solutions up front in an aggregation preprocessor, (2) considering the most “interesting” tires to be scheduled subsequently at each point of the algorithm, and (3) using cutting planes to provide for tight LP formulations for the subproblems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.