Abstract

We describe the development of the Heater Optimization Program (HOP), a software tool for scheduling the curing operation at Bridgestone/Firestone Off-The-Road (BFOR). The company produces large tires for heavy off-the-road machines such as trucks, tractors and earthmoving equipment used in the construction, lumber and mining industries. The huge tires, having different priorities, are built in molds and put into heaters for the curing process. The problem is to find a feasible assignment of tires to molds and molds to heaters to achieve a maximum total priority. HOP produces about 7% more tires per shift compared to the previous manual way of developing schedules and moves the company towards its goal of quick response manufacturing with low inventories. A user-friendly Windows interface, written around our custom made optimization routines, allows for easy retrieval of the data from the company's data bases and provides for a graphical representation of the optimization results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.