Abstract

The problem of scheduling with time-dependent processing times has been studied for more than two decades and significant advances have been made over the years. However, most work has paid more attention to the single-criterion models. Furthermore, most heuristics are constructed for the time-dependent scheduling problems in a step-by-step way. Motivated by the observations, this paper studies a two-agent scheduling model with increasing linear deterioration jobs in which the processing time of a job is modeled as an increasing linear function of its starting time. The objective function is to minimize the sum of the maximum weighted tardiness of the jobs of the first agent and the total weighted tardiness of the jobs of the second agent. This problem is known to be strongly NP-hard. Thus, as an alternative, the branch-and-bound, ant colony algorithm and simulated annealing algorithms are developed for the problem. Computational results are also presented to determine the performance of the proposed algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.