Abstract

This study introduces a two-machine three-agent scheduling problem. We aim to minimize the total tardiness of jobs from agent 1 subject to that the maximum completion time of jobs from agent 2 cannot exceed a given limit and that two maintenance activities from agent 3 must be conducted within two maintenance windows. Due to the NP-hardness of this problem, a genetic algorithm (named GA+) is proposed to obtain approximate solutions. On the other hand, a branch-and-bound algorithm (named B&B) is developed to generate the optimal solutions. When the problem size is small, we use B&B to verify the solution quality of GA+. When the number of jobs is large, a relative deviation is proposed to show the gap between GA+ and another ordinary genetic algorithm. Experimental results show that the proposed genetic algorithm can generate approximate solutions by consuming reasonable execution time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call