Abstract

This paper addresses a practical scheduling problem arising in the packaging department of a pharmaceutical industrial plant. The problem is modeled as a multi-purpose machine scheduling problem with setup and removal times, release and due dates and additional constraints related to the scarce availability of tools and human operators. The objective functions are minimization of makespan and maximum tardiness in lexicographic order. Representing a solution with a directed graph allows us to devise an effective tabu search algorithm to solve the problem. Computational experiments, carried on real and randomly generated instances, show the effectiveness of this approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.