Abstract

This paper presents a method, and some utilities, for establishing a planning and control system for the management of a computer centre. This planning system provides the conditions for optimal use and availability of the centre's resources. The system's structure is modular and extendible. It defines modules for establishing plans. It also creates automatic modules for monitoring and routine task execution according to the plan's imperatives. It has the ability to balance the redistribution of resources. Both the originality of its conception and the ease with which it can be set up make this system applicable to a large number of engineering domains, and especially to those with complex operations that need planning and real time monitoring.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.