Abstract

A symptom-oriented method for providing operational guidelines under postrip conditions is developed to support operators of boiling water reactor power plants. The method is dedicated to providing the operator with two levels of operational guidelines for a plant cold shutdown. Level I involves a selection of basic operating tactics, and level II involves a determination of operation priority and a confirmation of operation results. Technical evaluation of the guidance algorithm is made using off-line simulation tests postulding the events in loss-of-feedwater and loss-ofcoolant accidents. Results show that the developed method is adequate.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.