Abstract

Road Section with high rate of bridge and tunnel of freeway is the potential high risk section of safety and efficiency. This paper focuses on the traffic operation risk assessment of Road Section with high rate of bridge and tunnel of freeway. Firstly, the average speed and coefficient of variation of speed are selected as the traffic operation risk index and treated as the independent variables. Besides, average risk level index is built as the dependent index. Then the multivariate linear traffic operation risk assessment model is established. Take the Ma-Zhao Freeway in Yunnan as the demonstration road, traffic simulation is conducted. Using the output data of simulation, multiple linear regression is applied to estimate the coefficients of traffic operation risk assessment model of Road Section with high rate of bridge and tunnel of freeway. Finally, according to the cumulative frequency curve of average risk level index, traffic operation risk classification standard of road section with high rate of bridge and tunnel of freeway is established.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call