Abstract
Objectives: A critical pathway defines the optimal care process, sequencing and timing of intervention by multi-disciplinary health care teams for a particular diagnosis and procedure. It plays an important role as a cost-effective health care delivery system and a tool for quality control of medical and dental services by means of standardizing medical practices. The aim of this study is to investigate the satisfaction of patients and medical staff after implementation of a critical pathway for Korean medical treatment of lumbar disc herniation in integrative medical. Methods and Results: The pre-critical pathway group included 3 patients who underwent the implementation procedure from October 2020. All three patients have successfully been applied critical pathways during inpatient and outpatient treatment. Additionally, medical staff members were satisfied with the usefulness of the critical pathway. Conclusions: The implementation of critical pathway for the Korean medical treatment with lumbar disc herniation in integrative medical hospital can appraise possible applicability in actual clinical field.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have