Abstract
Installation of FACTS(Flexible AC Transmission System) device can maximize utilization of existing power facilities and reliability of power system. STATCOM has excellent characteristics in operating cost, maintaining facilities, loss and so on. However, STATCOM has a disadvantage of facility cost over capacity. So it is effective to coordinate STATCOM and existing external bank(capacitor and reactor) and OLTC(On Load Tap Changer). This paper mainly proposes coordinative control method between STATCOM installed within substation and other reactive power resources including Shunt Reactors and Shunt Capacitors and OLTC for voltage stability improvement. The proposed coordinative control method is developed for the STATCOM of Mi-gum substation and the simulation results of EMTP/RV model show the effectiveness of the proposed method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The Transactions of The Korean Institute of Electrical Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.