Abstract
In this study the intuitionistic fuzzy version of the critical path method has been proposed to solve networking problems with uncertain activity durations. Intuitionistic fuzzy set [1] is an extension of fuzzy set theory [2] unlike fuzzy set, it focuses on degree of belonging, the degree of nonbelonging or non-membership function and the degree of hesitancy which helps the decision maker to adopt the best among the worst cases. Trapezoidal and the triangular intuitionistic fuzzy numbers are utilized to describe the uncertain activity or task durations of the project network. Here trapezoidal and triangular intuitionistic fuzzy numbers are converted into their corresponding parametric form and applying the proposed intuitionistic fuzzy arithmetic operations and a new method of ranking based on the parametric form of intuitionistic fuzzy numbers, the intuitionistic fuzzy critical path with vagueness reduced intuitionistic fuzzy completion duration of the project has been obtained. The authentication of the proposed method can be checked by comparing the obtained results with the results available in pieces of literature.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.