Abstract

One especial characteristic of the PMBOK fourth edition is that the data flow betweenprocesses is defined with the definition of individual processes. Based on relations of input andthe output during an adjacent management process, we can visualize the network structure of42 project management processes analytically.The author showed that we could estimate the density of the process flow from the networkstructure based on the relations during the process of the first proximity.However, this network structure based on relations of first proximity is not including the indirectrelationship among management processes. Therefore, it is necessary to extract a cross-sectionaldata flowchart on knowledge areas by expanding analysis range of the management pass inconsideration of a highly advanced proximity element (process).Based on this cross-sectional data flowchart, it is able to visualize a complicated managementprocessing flow. As a result, it is found that there were complementary relations between theflow by way and by no way of the project integration management knowledge area. This suggeststhat network analysis technique is effective as method to visualize the flow of the managementprocess of project.In this paper, I would like to report the example of visualization of the management processingflow of some project management knowledge areas.

Highlights

  • One characteristic of PMBOK [1] is that data flowcharts corresponding to the each management process are described

  • In the third edition [3], it was changed to the data flowchart for every the project management (PM) knowledge area and it came to easy to look the flow of the management in each knowledge area

  • Management process of the PMBOK 4th edition From the data flowchart of 42 processes, it is able to get the adjacent line corresponding to the mutual relations between management processes described in PMBOK

Read more

Summary

INTRODUCTION

One characteristic of PMBOK [1] is that data flowcharts corresponding to the each management process are described. Management process of the PMBOK 4th edition From the data flowchart of 42 processes, it is able to get the adjacent line corresponding to the mutual relations between management processes described in PMBOK. It could be visualized the concept structure of the management process of PMBOK by analyzing this adjacent matrix. The data flow diagram for communication management knowledge area of PMBOK 4th edition is shown in figure 5. The data flow diagrams of the communication and stakeholders management knowledge areas of the PMBOK 5th edition are shown in figure 6 and 7

DISCUSSION
CONCLUSION
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.