Abstract
The presence of renewable distributed generation (DG) in electrical distribution systems (EDSs) has been increased in recent years, bringing technical, economical, and environmental benefits. However, the stochastic nature of renewable DG units increases the complexity of the planning and operation of EDSs. Hence, advanced planning models that take into account the uncertain nature of the renewable DG units, as well as their benefits in reducing emissions, are required. This work proposes a two-stage stochastic programming model for the expansion planning of EDSs that considers the uncertainties associated with the renewable DG units, the demand, and the energy price. The objective function minimizes the net present value of investments and operation costs, as well as the cost of CO 2 emissions. The proposed model was implemented in the AMPL modeling language and solved via the commercial solver CPLEX. Tests with a 24-node system illustrate the efficiency of the proposed model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.