Abstract

ABSTRACT: This paper describes a procedure to design pluvial drainage systems in such a way as to prevent large excavation volumes and erosive velocities. To this end the storage capacity of the channel system is taken into account. In a preliminary step, the procedure employs an approximate method to determine the channel dimensions. Therefore, the dimensions are adjusted by means of a numerical method of solution of the unsteady flow equations. An example is included.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call