Abstract

This paper aims to explain the production flow and the distribution logic of bobbins for rewinding process in a yarn dyeing factory, comparing the different scenarios of production (manual and automatic) using the computer simulation tools. The goal of this project is to build a model in which all the involved processes can be simulated with the consideration of all the parameters and constraints. The simulation model is used as a tool for the comparison of present manual setup and future automated setup for the production management of bobbin distribution in yarn rewinding process in terms of delays and costs. Since, the manual operation involves defaults, improper time management, errors and with the growing competitiveness globally, the companies in Europe need to automate as much as possible their production lines. The expected impacts are to increase the productivity and profitability, to have the possibility to customize the production, to develop production tools, implementation of the lean manufacturing tools.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.