Abstract
Workload control concepts are advocated as one of the new production planning and control methods. In its elaborated form, workload control includes three major decision levels: job entry, job release and priority dispatching. In each decision level, several decision points which have significant impact on the effectiveness of the production planning and control are defined (i.e., acceptance/rejection, due date assignment, etc.). Workload control systems should consider all of these decision points simultaneously in order to improve the effectiveness of production planning and control. In addition to these decision levels, flexibility of the shop can also be included as the fourth decision level which allows the shop capacity to be adjusted as new orders enter the system and as they are released to the shop floor. In this study, simulation models which enable the effect of each decision level within a workload control concept to be explored are developed and tested. The results reveal that simultaneous consideration of decision levels is critical and can improve the effectiveness of production planning and control.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have