Abstract

Summary An analytical solution is presented to estimate the maximum water-free production rate (critical oil rate) that considers the effect of limited wellbore penetration on the oil productivity of the well. To maximize the critical oil rate, an optimum wellbore penetration into an oil zone is determined theoretically. This analytical solution shows that the optimum wellbore penetration into a pay zone is less than one-third the total pay-zone thickness.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.