Abstract
The continuing need for high-throughput Automated Storage and Retrieval Systems (AS/RS) has lead to the introduction of storage/retrieval machines that can carry more than one unit-load. However, this technology involves a large capital investment so careful operating methods are desired to make the most of its capabilities. In this paper, we study a shift-based sequencing problem for twin-shuttle AS/RS, where depletion (retrieval operations) and replenishment (storage operations) of items occur over different shifts. For example, certain warehouses or distribution depots deplete their items in stock during morning shifts and replenish during later shifts. We show that this problem can be transformed into the minimum-cost perfect matching problem and present an efficient polynomial-time optimum method that can achieve a large throughput gain over other methods. We also provide average-case and lower bound analyses for this problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.