Abstract

This paper proposes a robust multistage approach to solve the generation and transmission expansion planning problem, which is formulated by the three-level method. This one is transformed into a bi-level problem to appraise the solution to this problem by the Benders decomposition method, which is then compared with the column and constraint generation (C&CG) solution. Results and computing times are analysed, assuming a limited budget in generation expansion and different generation capacity and demand. An illustrative example on the Mexican power system taking into account renewables sources enhances the effectiveness of the proposed approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.