Abstract
Usually, in monitoring schemes the nominal value of the process parameter is assumed known. However, this assumption is violated owing to costly sampling and lack of data particularly in healthcare systems. On the other hand, applying a fixed control limit for the risk-adjusted Bernoulli chart causes to a variable in-control average run length performance for patient populations with dissimilar risk score distributions in monitoring clinical and surgical performance. To solve these problems, a self-starting scheme is proposed based on a parametric bootstrap method and dynamic probability control limits for the risk-adjusted Bernoulli cumulative sum control charts. The advantage of the proposed control charts lies in the use of probability control limits when any assumptions about the patients’ risk distributions and process parameter. Simulation studies show that both proposed schemes have good performance under various shifts.
Paper version not known (Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.