Abstract

In the integrated project scheduling and personnel staffing problem the project activities are scheduled and simultaneously a staffing plan is composed to carry out a single project. In this way, the project schedule that leads to the staffing plan with minimum cost is determined. In this paper, we evaluate different scheduling policies and practices for different personnel resource types. We examine the impact on the staffing cost when the personnel resources are scheduled in a cyclic versus a non-cyclic manner for different (days on, days off)-patterns. Furthermore, the impact of introducing more flexible resource types, such as overtime and temporary help, is explored in relationship with the activity resource demand variability. Computational results show that non-cyclic scheduling leads to a considerable lower staffing cost under all circumstances compared to cyclic scheduling. However, despite the tractability of the resource requirements, flexible temporary resources are essential on top of the regular personnel resources to respond to the variability in demand. The addition of overtime on a strategic staffing level only marginally decreases the personnel cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call