Abstract
In this study, we consider a Resource Investment Problem with time/resource trade-offs in project networks. We assume that there is a single renewable resource and the processing requirement of an activity can be reduced by investing extra resources. Our aim is to minimize the maximum resource usage, hence, the total amount invested for the single resource, while meeting the pre-specified deadline. We formulate the problem as a mixed integer linear model and find optimal solutions for small-sized problem instances. For large-sized problem instances, we propose a heuristic solution procedure. We develop several lower bounds and use them to evaluate the performance of our heuristic procedure. The results of our computational experiments have revealed the satisfactory behaviour of our optimality properties, lower bounds and heuristic procedure.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.