Abstract

In this paper, we study the production time allocation issue for a multi-purpose manufacturing facility. This production facility can produce different types of make-to-order and make-to-stock products. Using a vacation queueing model, we develop a set of quantitative performance measures for a two-parameter time allocation policy. Based on the renewal cycle analysis, we derive an average cost expression and propose a search algorithm to find the optimal time allocation policy that minimizes the average cost. Some numerical examples are presented to demonstrate the effectiveness of the search algorithm. The vacation model used in this paper is also a generalization of some previous vacation queueing models in the literature. The results obtained in this study are useful for production managers to design the operating policy in practice.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.