Abstract

A Proposed Mathematical Model to Improve Workforce Scheduling at Maintenance Department of Rabigh Independent Power Plant

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call