Abstract
In the paper, the authors propose a new quantitative assessment method of rock condition based on observational classification obtained at the tunnel face, which will enable to know either strength or deformability of rock mass, further more appropriate amount of rock bolts, thickness of shotcrete and size and pitch of steel ribs just after the blasting procedure. The study is confirmed by the database of up to the 6,101 sections of tunnels constructed by Japan Highway Public Corporation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.