Abstract
In the practical application of push-pull based production planning and scheduling architecture, the manufacturing system was found lacking of collaborative mechanism, especially for a networked-manufacturing environment, which requires each individual manufacturer interact and cooperate with each other for a collaborative manufacturing. This paper presents a production planning and scheduling architecture for networked-manufacturing system based on available-to-promise, which can effectively merge forecast-driven production activity with order-driven production activity, thus ensures the steady and prompt supply of material, and also cooperation and mutual benefit of individual manufacturer. This architecture consists of 1) an ATP-based order management and decision-making system, 2) a push-pull based multi-plant master production schedule collaboration model, 3) a pre-reactive collaborative replenishment model, 4) a production scheduling model of unrelated parallel machine and 5) the corresponding production planning and scheduling methods for each model. By combining the concept of ATP, this architecture can not only provide resource planning for networked-manufacturing system, but also offer quick response and promise to customer requests.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.