Abstract

This paper considers the job shop scheduling problem with alternative operations and machines, called the flexible job shop scheduling problem. As an extension of previous studies, operation and routing flexibilities are considered at the same time in the form of multiple process plans, i.e. each job can be processed through alternative operations, each of which can be processed on alternative machines. The main decisions are: (a) selecting operation/machine pair; and (b) sequencing the jobs assigned to each machine. Since the problem is highly complicated, we suggest a practical priority scheduling approach in which the two decisions are done at the same time using a combination of operation/machine selection and job sequencing rules. The performance measures used are minimising makespan, total flow time, mean tardiness, the number of tardy jobs, and the maximum tardiness. To compare the performances of various rule combinations, simulation experiments were done on the data for hybrid systems with an advanced reconfigurable manufacturing system and a conventional legacy system, and the results are reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.