Abstract
Abstract Studies of future energy and water needs in Egypt showed the possibility of introducing nuclear power plants. Multi-stage flash-vertical tube evaporator coupling to such a plant could result in relatively cheap water desalination. Overall reactor design methodologies including physical, thermal lifetime and economic analyses were developed and verified with published data. A computer program was prepared and its use in overall plant optimization studies was indicated. Preliminary features for a 400 MW(e), 250 mgd, PWR plant were outlined. Complementary optimization studies are pointed out.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.