Abstract

A recently developed predictive out-of-step protection system is described. The purpose of this protection system is to prevent total system collapse caused by step-out between large-capacity generator groups due to a serious fault in the trunk transmission line. This is accomplished by using online data collected during the incubation phase to predict a step-out and then issuing a system-seperation command. The system has the following characteristics: (1) the phase difference between several large generator groups is measured from online voltage data collected from substation busbars in the vicinity of the generators at a sampling rate of 600 Hz: (2) the phase difference at 200 ms in the future is predicted from the measured phase-difference data; and (3) if the predicted phase difference exceeds the instability threshold value, system separation if performed taking into account the power supply and demand balance after tripping.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call