Abstract
Abstract Undervoltage load shedding serves to maintain voltage stability when a majority of loads are fast acting. An undervoltage load shedding scheme should address two tasks: the detection of voltage instability following a large disturbance and the determination of the amount of load to be shed. Additionally, in case of short-term voltage instability, the scheme should be fast. This paper proposes a method to predict voltage instability arising due to a large disturbance. The amount of load to be shed to maintain voltage stability is then determined from the Thevenin equivalent of the network as seen from the local bus. The proposed method uses local measurements of bus voltage and power, and does not require knowledge of the network. The method is validated by simulation of three test systems subjected to a large disturbance. The proposed scheme is fairly accurate in estimating the minimum amount of load to be shed to maintain stability. The method is also successful in maintaining stability in cases where voltage collapse is detected at multiple buses.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Emerging Electric Power Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.