Abstract

The two-stage flow shop scheduling problem with a batch processing machine and limited waiting time was studied in the paper entitled “Two new approaches for a two-stage hybrid flowshop problem with a single batch processing machine under waiting time constraint” [Chung, T.-P., Sun, H., Liao, C.-J., 2016, Computers &Industrial Engineering, 10.1016/j.cie.2016.11.031]. In the original paper, this problem was formulated as a mixed-integer linear programming model. However, this model is not correct and the blocking time is confusing. In this note, a correct mixed-integer linear programming model is proposed and the confusing blocking time is discussed. Numerical experiments are conducted to illustrate the necessity of correction.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call