Abstract

Gupta and Magnusson [The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers and Operations Research 2005;32(4):727–47] develop a model for the single machine capacitated lot-sizing and scheduling problem (CLSP) with sequence dependent setup times and setup costs, incorporating all the usual features of setup carryovers. In this note we show that this model does not avoid disconnected subtours. A new set of constraints is added to the model to provide an exact formulation for this problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call