Abstract
THE OHIO Stamping Plant of Chrysler. Corporation at Twinsburg, Ohio, covers an area of 1,500,000 sq ft (square feet), approximately 34 acres. Power is supplied by the Ohio Edison Company to supply the great number of motor loads and so forth for the heavy presses and other manufacturing equipment in the plant. The estimated short-circuit duty is 2,500,000 kva, based on long-range future plans. The estimated initial short-circuit duty is 600,000 kva 3 phase symmetrical.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transactions of the American Institute of Electrical Engineers, Part II: Applications and Industry
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.