Abstract

The sequencing of products for mixed-model assembly line in Just-in-Time manufacturing systems is sometimes based on multiple criteria. In this paper, three major goals are to be simultaneously minimized: total utility work, total production rate variation, and total setup cost. A multi-objective sequencing problem and its mathematical formulation are described. Due to the NP-hardness of the problem, a new multi-objective particle swarm (MOPS) is designed to search locally Pareto-optimal frontier for the problem. To validate the performance of the proposed algorithm, various test problems are solved and the reliability of the proposed algorithm, based on some comparison metrics, is compared with three distinguished multi-objective genetic algorithms (MOGAs), i.e. PS-NC GA, NSGA-II, and SPEA-II. Comparison shows that MOPS provides superior results to MOGAs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.