Abstract

The application of phasor measurement units (PMUs) in power systems is increasing because of their advantages such as the capability for online state estimation and improvements in the speed of control, and protection systems. In this paper, we propose a new method using binary integer linear programming for the optimal placement of PMUs to guarantee full observability of a power system as well as maximizing the measurement redundancy. Moreover, the problem of the optimal placement of these units in the case of a single PMU loss or single line outage is investigated. A practical limitation is also considered on the maximum number of PMU channels, in the proposed formulation. In all of the investigations, the effect of zero-injection buses in the power system was considered. The efficiency of the proposed method was demonstrated in different conditions. The method was applied to several IEEE standard test systems, i.e., the 14-, 30-, 39-, 57-, and 118-bus systems, and in two very large-scale systems, i.e., 2383- and 2746-bus systems. The simulation results verified the acceptable performance of the proposed method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.