Abstract

ABSTRACT The scientific filling effect characterization is very important for backfill mining. A new filling effect index, the final backfill ratio (FBR), is proposed through experimental tests and theoretical analysis, and the sensitivity of FBR is studied in this paper. The control method of FBR is obtained and applied to optimise the filling effect for the backfill panel in Kailuan Group in China. It is concluded that every 0.05 m reduction of the void between the filling body and roof corresponds to 1.87% increase in FBR. FBR increases by 1.47% and 3.15% respectively when the UCS of the backfill body increases from 2MPa to 3MPa and 4MPa.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.