Abstract

<span lang="EN-IN">Offshore wind power plants are gaining importance in recent years, as there is adequate space available for its installation, high wind speed, no restriction on the size of turbine blades (no transportation and construction problem) and blades can be allowed to rotate at higher speed without any noise constraint, thereby increasing the rated power. However, the existing offshore wind farms face greater cost related challenges than those of onshore plants. The integration of offshore wind farm with onshore power grid is a complex issue. Feasible solutions for power transmission through cables from offshore wind farms to onshore are HVAC, line commutated HVDC and VSC-HVDC. This paper analyses the various schemes for integration of offshore wind farm with onshore power grid and suggests that LFAC with submarine cable operating at 0.7 Hz is an optimal choice in obtaining better performances. </span>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.