Abstract

Estimation of the change point of a process may be the most important result and application of control charts in the literature of statistical process control. The time to the change point called process failure mechanism may have the most vital role in optimal design of control charts. Applying the total time on test plot as a supreme tool for the failure rate shape identification is proposed in this paper to pick out an appropriate failure model. The unknown parameters of the fitted distribution then can be estimated by some common statistical methods like maximum likelihood based on the estimated change point data. The generalized cost model of Rahim and Banerjee (1993) adapted for fitted shock model will determine eventually the optimal design parameters of control charts economically and statistically. A numerical study on the optimal design of -control chart illustrates our practical approach for production systems with bathtub-shaped failure rate.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.