Abstract
We consider a kind of job shop scheduling problems with due-date constraints, where temporal relaxation of machine capacity constraint is possible through subcontracts. In practice, this kind of problem is frequently found in manufacturing industries where outsourcing of manufacturing operation is possible through subcontract. We present a heuristic algorithm that addresses the problem by solving a series of smaller subproblems to optimality. For the sake of efficiency, the algorithm repeatedly executes in two steps—(1) improving the sequence of operations and (2) picking out the operations to be subcontracted—on bottleneck machines. Experiments are conducted for example problems, and the result of the experiment confirms the viability of the suggested algorithm.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.