Abstract

In this study, an Integrated Simulation-Data Envelopment Analysis (DEA) approach is presented for optimum facility layout of maintenance workshop in a gas transmission unit. The process of repair of incoming parts includes various operations on different facilities. The layout problem in this system involves determining the optimum location of all maintenance shop facilities. Layout optimization plays a crucial role in this type of problems in terms of increasing the efficiency of main production line. Standard types of layouts including U, S, W, Z and straight lines are considered. First, the maintenance workshop is modeled with discrete-event-simulation. Time in system, average waiting time, average machine utilization, average availability of facilities, average queue length of facilities (AL) and average operator utilization are obtained from simulation as key performance indicators (KPIs) of DEA. Also, safety index and number of operators are considered as other KPIs. Finally, a unified non-radial Data Envelopment Analysis (DEA) is presented with respect to the stated KPIs to rank all layouts alternatives and to identify the best configuration. Principle Component Analysis (PCA) is used to validate and verify the results. Previous studies do not consider safety factor in layout design problems. This is the first study that presents an integrated approach for identification of optimum layout in a maintenance workshop of gas transmission unit by incorporating safety and conventional factors.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call