Abstract

A network flow method is outlined for solving the linear programming problem of computing the least cost curve for a project composed of many individual jobs, where it is assumed that certain jobs must be finished before others can be started. Each job has an associated crash completion time and normal completion time, and the cost of doing the job varies linearly between these extreme times. Given that the entire project must be completed in a prescribed time interval, it is desired to find job times that minimize the total project cost. The~method solves this problem for all feasible time intervals.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.